STP plant cost calculator
Factors: capacity (KLD), technology choice, logistics band, and scope boundaries (civil/electrical split).

What moves the number?
- Capacity — hydraulic and organic load envelope.
- Technology — membranes and tertiary steps add precision and lifecycle cost.
- Location — logistics, power availability, and site access.
100 KLD
Indicative CAPEX band
INR 90,44,000 – 1,22,36,000
Midpoint reference: INR 1,06,40,000
Indicative range only. Final pricing depends on civil scope, electrical standards, discharge limits, logistics, and taxes. Not a quotation.
Prefer a call-back with your numbers filled in?
Leave your details — we will use the capacity, technology, and location band shown above when our engineer contacts you.
Calculator FAQs
Is this a binding quotation?+
No — it is a budgeting aid. A firm quote requires site-specific engineering and scope sign-off.
Want an exact quotation?
Send drawings and consent limits — we validate the calculator assumptions.